حامل الألواح
Heavy-duty slab racks for granite, marble and quartz support organized storage, capacity and safer access.
View Slab Racks →أنجز عملك بكفاءة!
Speedone manufactures slab racks, transport carts, A-frames, lifting equipment, forklift attachments, display racks and stone-waste handling systems for professional stone operations.
Use slab racks or A-frame racks for storage, transport carts or mobile A-frames for internal movement, lifting clamps for crane-assisted handling, and forklift attachments only after confirming forklift compatibility. Final selection should be based on slab dimensions, maximum weight, contact surface, route conditions, operating environment and required documentation.
Choose equipment by the job it must perform: store slabs, move them through production, lift them safely, support forklift operations, fabricate countertops or remove heavy stone waste.
Heavy-duty slab racks for granite, marble and quartz support organized storage, capacity and safer access.
View Slab Racks →
Mobile handling systems for moving slabs and fabricated pieces between workstations and staging areas.
View Transport Carts →
Angled transport structures for supporting slabs during movement inside factories, warehouses and job areas.
View Transport A-Frames →
Single- or double-sided storage systems for slab warehouses, stone yards and fabrication areas.
View A-Frame Racks →
Booms, spreader bars and attachments selected according to forklift capacity, load geometry and reach.
View Forklift Equipment →
Mechanical lifting tools that require confirmation of slab material, thickness, weight, surface and grip range.
View Clamp Lifters →
Work tables and equipment for cutting, assembling and finishing granite, quartz and marble countertops.
View Fabrication Equipment →
Reinforced containers and forklift-compatible systems for collecting and moving dense stone scraps.
View Waste Equipment →This table helps buyers shortlist the correct equipment family before discussing model-specific dimensions, working load, configuration and operating limits.
| Your Operating Need | Start With | Confirm Before Ordering | Main Risk if Mismatched |
|---|---|---|---|
| Fixed, high-density vertical slab storage | حامل الألواح | Maximum bundle weight, post spacing, floor condition, access method and protection pads | Overloading, unstable storage, difficult slab access or surface damage |
| Single- or double-sided angled storage | رف تخزين بإطار على شكل A | Capacity per side, frame angle, base width, slab height, forklift access and indoor/outdoor finish | Center-of-gravity problems, aisle conflicts or premature corrosion |
| Frequent movement between machines or work zones | عربة نقل الألواح | Load, wheel type, route width, floor joints, turning radius, braking and operator method | Poor maneuverability, wheel damage, uncontrolled movement or workflow bottlenecks |
| Mobile transport with angled slab support | لوح نقل الألواح A- الإطار | Slab quantity, retaining method, wheel/caster arrangement, route and loading method | Slab shifting, tipping exposure or unsuitable access at loading points |
| Vertical lifting with crane or hoist | رافع المشبك | Material, thickness, surface, maximum unit weight, grip range, WLL and operating instructions | Loss of grip, slab damage or unsafe lifting conditions |
| Extend forklift reach or handle suspended loads | Forklift Boom / Attachment | Forklift model, rated capacity at load center, attachment weight, reach, securing method and load chart | Reduced residual capacity, instability or incompatibility with the forklift |
| Customer-facing slab browsing and presentation | رف عرض الألواح | Panel size, display count, pull-out or fixed format, floor space and customer access | Poor usability, insufficient capacity or damage during repeated selection |
| Collect and move dense production waste | حاوية النفايات الحجرية | Volume, expected debris weight, discharge method, forklift pockets and floor route | Container deformation, difficult unloading or unsafe waste movement |
A vague inquiry produces a vague quote. Send these details early to reduce redesign, specification disputes, packing changes and avoidable delays.
Identify granite, marble, quartz, porcelain, sintered stone, glass or another panel material.
Provide maximum length, height, thickness and whether the load is a single slab or a bundle.
State the maximum working weight and how it was calculated. Avoid estimates based only on average slabs.
Explain whether operators use forklifts, cranes, hoists, vacuum lifters, clamps or manual pushing.
Share aisle width, turning points, floor joints, slopes, indoor/outdoor exposure and corrosion conditions.
Confirm destination country, shipment method, packing limits and any documentation required by your company or market.
For industrial equipment, expertise is demonstrated by the quality of the questions asked before production. A reliable process converts application details into an agreed product scope, drawing, material configuration, inspection plan and packing method.
Confirm material, dimensions, load, route, handling method, environment and destination requirements.
Document dimensions, configuration, capacity basis, surface treatment, options and interface requirements.
Coordinate material preparation, cutting, welding, machining, surface treatment and assembly against the approved scope.
Check key dimensions, structure and operating functions. Confirm the exact test scope for the selected product.
Confirm packing dimensions, protection, labels, shipment method and the documents included with the order.
Custom equipment should not begin with “make it stronger.” It should begin with measurable operating inputs and end with an approved scope.
Changes requested after drawing approval can affect material, cost, production time and packing. Confirm critical dimensions and interfaces before production—not when the container door is already closing.
The strongest B2B homepage does not ask buyers to “trust us.” It tells them what evidence to request and which document controls the final order.
Confirm the legal company name, payment beneficiary, business address, contact details and export entity before payment.
These details must match across the website, quotation and legal pages.Use a signed quotation, specification sheet or drawing to confirm dimensions, capacity, configuration and included options.
Marketing copy must never override the approved technical document.Agree which dimensions, functions, finishes or tests will be recorded before shipment and how evidence will be shared.
Test scope varies by product; ask what is actually included.Request the exact certificate, audit, report or declaration needed for the model and destination market.
A certification logo alone does not prove scope or product coverage.Compare your application with similar storage, movement and lifting workflows. Customer-specific information should be shared only with approval and without inventing anonymous performance claims.
Match rack type and spacing to slab dimensions, bundle weight, aisle width, forklift or crane access and material turnover.
Select wheel type, cart configuration and route clearance around cutting, polishing, staging and inspection zones.
Confirm grip range, surface condition, WLL, hoist compatibility, lifting orientation and operating instructions.
Send your slab type, maximum load and workflow. Speedone can identify relevant product or production materials where customer confidentiality permits.
Industrial buyers often compare price before confirming the operating assumptions behind the price. That is where mismatched equipment, rework and compliance delays begin.
The number may refer to a specific test condition, total load, one side, static load or another defined basis.
Incorrect shortlist, overloaded structure or equipment that cannot support the real operating method.
Granite, marble, quartz, porcelain and glass do not respond the same way to contact pressure or edge support.
Scratches, chips, marking, breakage or the need to retrofit pads and protection after delivery.
Humidity, rain, salt exposure, abrasive dust and cleaning chemicals affect finish selection and maintenance.
Premature corrosion, appearance problems and shorter service life.
Attachments add weight and move the load center, which can reduce the usable lifting capacity of a forklift.
Incompatibility, poor stability or unsafe operating conditions.
Verbal descriptions rarely define every dimension, interface, accessory, finish and packing detail.
Disputes, rework, production changes, additional freight cost or equipment that does not fit the site.
Certification scope, issuing body, model coverage and destination requirements must be checked.
Customs, customer-approval or project-compliance delays after the order is already in production.
Document availability depends on the product, project scope and destination market. Before ordering, specify which certificates, declarations, drawings, inspection records, manuals, labels or packing documents your company requires.
The approved quotation or technical document should state what is included. This prevents a cheerful “yes, available” from turning into a very uncheerful customs surprise.
Use practical guides to compare equipment, prepare an RFQ and understand the risks behind storage, transport and lifting decisions.
Review aisle width, access method, bundle load, inventory flow and warehouse space before setting rack positions.
Read Guide →
Compare capacity, wheel type, route, floor, braking, maneuverability and the way operators load the cart.
Read Guide →
Understand why material, thickness, surface, weight, grip range and lifting method all affect equipment selection.
Read Guide →These answers provide a selection framework. Final operating limits and product requirements must be confirmed for the exact model and application.
قم بالتأكيد على ما تمثله السعة المذكورة: الحمولة القصوى للعمل، الحمولة السكونية، إجمالي حمولة الرف، الحمولة لكل جانب أو حالة محددة أخرى. يجب أن تظهر أساسيات السعة النهائية في عرض الأسعار أو المواصفات أو الرسم التوضيحي أو وثائق المنتج الخاص بالنموذج المختار.
قدم نوع المادة، وحالة السطح، والأبعاد القصوى، والوزن الأقصى للقطعة الواحدة أو الحزمة، والكمية، والاستخدام في الداخل أو الخارج، وطريقة التحميل، والحدود الخاصة بالمسارات أو الممرات، وتفاصيل الرافعة الشوكية أو الرافعة، ودولة الوجهة، والمستندات المطلوبة.
اختر رفًا على شكل لوح عندما تكون الأولوية الرئيسية للتخزين الرأسي الثابت وتباعد الأعمدة القابل للتعديل. اختر رفًا على شكل إطار حرف A عندما يكون الدعم المائل، والوصول من جانب واحد أو جانبين، ووجود جيوب للرافعات الشوكية، أو تدفق عمل محدد للمستودع أكثر ملاءمة. تُحدِّد السعة ومساحة الأرضية وسهولة المناولة الاختيار النهائي.
الاستخدام في الأماكن المفتوحة قد يُغيّر متطلبات المواد أو الطلاء أو الجلفنة، واحتياجات الصرف والصيانة، واختيار الأدوات التثبيت، وحماية الأسطح المتلامسة. شارِك المعلومات المتوقعة عن التعرض للمطر والرطوبة والملح والغبار أو المواد الكيميائية قبل الإنتاج.
تدعم سبيدون مناقشات OEM وODM بالنسبة للأبعاد والسعة والتكوين والمعالجة السطحية والألوان والملصقات والتغليف. تعتمد الجدوى والتكلفة ووقت الإنتاج على التطبيق الفعلي والنطاق الفني المعتمد.
قم بتأكيد طراز الرافعة الشوكية، والسعة المقدرة، والسعة المتبقية عند مركز التحميل المطلوب، ووزن الملحقات، والمدى المطلوب، وطريقة التثبيت، وهندسة الحمولة، والإجراء التشغيلي المقصود. قد يحتاج مصنع الرافعة الشوكية أو متخصص محلي مؤهل إلى التحقق من التوافق.
اعتمادًا على المنتج والطلب، يمكن للمشترين مناقشة صور الإنتاج، وفحوصات الأبعاد الرئيسية، وفحص المظهر، والمراجعة الوظيفية، ونطاق اختبار التحميل المتفق عليه، وصور التعبئة، والملصقات، ونسخ الوثائق. يُرجى ذكر الأدلة المطلوبة قبل تأكيد الطلب.
تُدعم شركة Speedone الاستفسارات الدولية، وتعبئة الصادرات، وتنسيق الشحن. يرجى تأكيد الوجهة، وشروط التسليم (Incoterms)، والحدود الخاصة بالعبوات، والوثائق المطلوبة، وطريقة التفريغ، ومتطلبات الاستيراد المحلية أثناء إعداد العرض السعري.
Published by Xiamen Speedone Industry Co., Ltd. Page version updated . Product descriptions are for initial evaluation; final technical documents control the order.
Send enough information for a technical shortlist—not just “please quote a slab rack.” Speedone can compare standard products or discuss a custom configuration.
The more precise the inputs, the fewer surprises after quotation.
مرحبًا بكم في سبيدون!
احصل على عرض أسعار سريع وكتالوج وحد أدنى للطلب ومدة تسليم لاحتياجاتك من معدات مناولة الحجارة.
إذا كنا غير متصلين، يرجى ترك رسالة.
البريد الإلكتروني: [email protected]
احصل على عرض أسعار عبر WhatsApp
الرد خلال 6–12 ساعة | الكتالوج متاح
احصل على عرض أسعار


